docs: record what the subgroups plan built, and the six places it chose differently
All nine phases are built, one commit each. The phases are kept as written -- they are the reasoning, and the code reads better against the argument it came from than against a summary of itself -- with a table of where the building disagreed with the plan. Six worth reading. `openCeremony` was never built, because a wrapper over two repository calls the picker already makes would be a third name for one act. `MarmotGroupCreation` is reached through the repository rather than called from a view model, because view models here talk to repositories and managers take the database. The guards' tests are in jvmTest rather than pure, because every refusal reads the database and a pure version would test less. Phase 4 added two tags rather than one, the second fixing a bug older than subgroups -- every robust group has been arriving nameless on every device but its creator's. `stateFrom` needed a third reader and a wrapper, because "tag present and unreadable" looks identical to "absent" through a parser, and "refused" has to be distinguishable from "none claimed". And Phase 8's two capability refusals short-circuited the tests already written, which is how it came out that the fixtures had never had a parent that could sign. Two the plan got right and worth keeping if this is ever rewritten: the key-package check moved to the picker on review, before a line was built, and it is the difference between a subgroup failing in a second and failing after three ceremonies; and the founding-roster rule has a test whose job is to fail the day somebody adds the comparison that looks obviously missing. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
1 parent
3ae49bd338
commit
0180425904
2 files changed
+24
-3
No files matched your search
+1
-1
@@ -29,7 +29,7 @@ chronicle note is a phased plan that has not been built, and reads as the
|
||||
membership note's unanswered half: what a member who joins late can be given,
|
||||
and the one thing they cannot. The
|
||||
jvm-target note is unrelated to all of them: it is a build and packaging story.
|
||||
The subgroups note is a phased plan that has not been built; it assumes both
|
||||
The subgroups note is a phased plan that has been built; it assumes both
|
||||
shared-key notes and reads as the ceremony's second half — what a group does
|
||||
once it has a key, and what it can say about a group that does not yet.
|
||||
The Material Design note is a phased plan that has not been built, and is the
|
||||
|
||||