docs: record what the profiles pull built, and the reverse direction measured
Some checks failed
Material Design conformance / budgets (push) Has been cancelled
Material Design conformance / tests (push) Has been cancelled

The plan's top now says it was built, the same day it was written: the
ten commits in four phases at the dry run's numbers exactly, Phase 6's
two native items done, and its other three -- pushing the removal, the
two reverse-pulls, the fork decision -- named as the user's. Phase 6
gains its own Built paragraph: what the refusal changed and did not
change in the DAO's welcome branch, the four re-pointed anchors, and a
measurement the plan had only asserted -- that a Mantra commit offers
itself to the fork cheaply. git format-patch on the refusal commit, four
inverse rules over the patch text, and git apply --check on a scratch
worktree of curated/curated at 29027f2b: it applies cleanly, five files.
That is the shape a normaliser running the other way would take, and it
is recorded so the fork can take the commit in seconds rather than by
hand. The README's reading-order sentence and the first plan's pointer
say "built" where they said "planned".

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
Kgothatso Ngako
2026-09-13 16:09:22 +02:00
parent 2620e43d57
commit 213535278a
3 changed files with 48 additions and 6 deletions

View File

@@ -46,10 +46,10 @@ alone, except that its first decision leans on the derivation note's one rule. T
the lines it pulled -- the group's nostr identity and the curated lists -- were taken
out again the same day, and its record says what went and what stayed. The nsec and
npub sign-in notes arrived with it and record what they built. The profiles pull note
is the same exercise a second time, planned with its dry run already done; read it
after the first, because it assumes the method and the three decisions and only says
what changed — chiefly that the tree is no longer a superset, and what the check for an
exact pull becomes when it is not.
is the same exercise a second time, planned with its dry run already done and built
the same day; read it after the first, because it assumes the method and the three
decisions and only says what changed — chiefly that the tree is no longer a superset,
and what the check for an exact pull becomes when it is not.
The nsec sign-in note is a phased plan that has been built; it inherits the
key-storage decision from the jvm-target note and drives the navigation state
machine `NavigationViewModel.processLocalAccount` implements, so read it with the